Sludge Pasteurisation Plants

Scope included the design, build and commissioning of 6 PURAC Purisers for Anglian Water at:
  • Caister WwTW
  • Cliff Quay WwTW
  • Great Billing WwTW
  • Bedford WwTW
  • Cambridge WwTW
  • Chelmsford WwTW
  • Product Details
  • Product Photos

Control system and software design and development for a continuous batch process control of Sludge Pasteurisation Plant.  System controlled by an Allen Bradley PLC interfaced to a Panelview.  The control philosophy involved the sludge heating using heating and recovery coil heat exchangers to 72°C and holding the sludge for 30 minutes to kill pathogens for sludge disposal to land fill.  Residual heat recovery was use to heat incoming ambient sludge.  Sludge flow and heat to digesters was also improved and managed.