During the Front End Engineering & Design (FEED) phase the assumptions and conclusions of the pre-FEED were checked and updated. The basis for the FEED was the Basic Engineering Design Data and met the following objectives:
• Review the scope of work, basis of design and other design input data to determine if there are changes in the assumptions and conclusions.
• Provide a system design with sufficient detail to proceed to the EPC phase of the project.
• Development of the project design specifications and technical details in accordance with the engineering requirements, standards and specifications.
• Support the project team in completion of the required phase gate review and deliverables to enable project sanction.
• Support the procurement process through RFQ preparation to determine industry market costs and schedules for equipment for Long Lead Items.
• Perform capital cost estimates for the project, adequate to meet project sanction requirements.
• Contribute to the Project Execution Plans for the implementation phase of the project, including an organization chart showing resources, engineering description, procurement, fabrication, installation, commissioning and hand-over activities.
• Contribute to the Master Project Schedule.
• Preparation of documents needed for the implementation phase of work; requirements for the design, fabrication, installation, commissioning and start-up of the facility.
• Operations Department Design Review.