Birkenhead BAFF Pumping Station

Optimise BAFF Backwash sequences. Addition of Inlet pump and tuning Heat Exchange valves.
  • Product Details
  • Product Photos

Validate and optimise the BAFF Backwash sequences for 8 cells at the Birkenhead Waste Water Treatment Works in the UK. Addition of Inlet pump to increase flow through capacity. PID tuning for Heat Exchange valves for optimum performance and run step change trials. Modify SCADA and PLC systems to reflect the changes. An assorment of other modifications were made to rectify outstanding maintenance issues especially with the Allen Bradley DH+ industrial network.